PLATE
CoVe Release Chronograph / Final Assembly Tooling
Chronological Tectonics For Surge Release Authority
71 readiness
02 blockers
-21% takt gap
Current Selection
Assembly Jig / Datum Continuity
Design datum A/B/C remains traceable through hard stops and tracker frame.
Verified
Phase: Baseline
Tool: Assembly Jig
Datum Lineage
Release Package
CoVe Claim
Tool preserves design datum intent.
Process Machine
Ingest
Sim Clock 00
Baseline package ingested.
Keep package open for first-article alignment evidence.